返回提示词库Back to prompts
当前显示中英对照

营销运营marketing

Agency Growth Bottleneck Identifier

来自 prompts.chat 开放提示词库的公开模板,适合营销、销售和产品表达。正文保留原文,方便直接复制使用。

An open prompt template from prompts.chat for marketing, sales, and product messaging. The original wording is preserved for direct copying.

ChatGPTClaudeGemini
0 次复制copies·小黑丸整理Curated by XHW

提示词正文Prompt text

复制后替换变量Replace variables after copying
Role & Goal
You are an experienced agency growth consultant. Build a single, cohesive “Growth Bottleneck Identifier” diagnostic framework tailored to my agency that pinpoints what’s blocking growth and tells me what to fix first.

Agency Snapshot (use these exact inputs)
- Agency type/niche: [YOUR AGENCY TYPE + NICHE]
- Primary offer(s): [SERVICE PACKAGES]
- Average delivery model: [DONE-FOR-YOU / COACHING / HYBRID]
- Current client count (active accounts): [ACTIVE ACCOUNTS]
- Team size (employees/contractors) + roles: [EMPLOYEES/CONTRACTORS + ROLES]
- Monthly revenue (MRR): [CURRENT MRR]
- Avg revenue per client (if known): [ARPC]
- Gross margin estimate (if known): [MARGIN %]
- Growth goal (90 days + 12 months): [TARGET CLIENTS/REVENUE + TIMEFRAME]
- Main complaint (what’s not working): [WHAT'S NOT WORKING]
- Biggest time drains (where hours go): [WHERE HOURS GO]
- Lead sources today: [REFERRALS / ADS / OUTBOUND / CONTENT / PARTNERS]
- Sales cycle + close rate (if known): [DAYS + %]
- Retention/churn (if known): [AVG MONTHS / %]

Output Requirements
Create ONE diagnostic system with:
1) A short overview: what the framework is and how to use it monthly (≤10 minutes/week).
2) A Scorecard (0–5 scoring) that covers all areas below, with clear scoring anchors for 0, 3, and 5.
3) A Calculation Section with formulas + worked examples using my inputs.
4) A Decision Tree that identifies the primary bottleneck (capacity, delivery/process, pricing, or lead flow).
5) A “Fix This First” prioritization engine that ranks issues by Impact × Effort × Risk, and outputs the top 3 actions for the next 14 days.
6) A simple dashboard summary at the end: Bottleneck → Evidence → First Fix → Expected Result.

Must-Include Diagnostic Modules (in this order)
A) Capacity Constraint Analysis (max client load)
- Determine current delivery capacity and maximum sustainable client load.
- Include a utilization formula based on hours available vs hours required per client.
- Output: current utilization %, max clients at current staffing, and “over/under capacity” flag.

B) Process Inefficiency Detector (wasted time)
- Identify top 5 recurring wastes mapped to: meetings, reporting, revisions, approvals, context switching, QA, comms, onboarding.
- Output: estimated hours/month recoverable + the specific process change(s) to reclaim them.

C) Hiring Need Calculator (when to add people)
- Translate growth goal into role-hours needed.
- Recommend the next hire(s) by role (e.g., account manager, specialist, ops, sales) with triggers:
  - “Hire when X happens” (utilization threshold, backlog threshold, SLA breaches, revenue threshold).
- Output: hiring timeline (Now / 30 days / 90 days) + expected capacity gained.

D) Tool/Automation Gap Identifier (what to automate)
- List the highest ROI automations for my time drains (e.g., intake forms, client comms templates, reporting, task routing, QA checklists).
- Output: automation shortlist with estimated hours saved/month and suggested tool category (not brand-dependent).

E) Pricing Problem Revealer (revenue per client)
- Compute revenue per client, delivery cost proxy, and “effective hourly rate.”
- Diagnose underpricing vs scope creep vs wrong packaging.
- Output: pricing moves (raise, repackage, tier, add performance fees, reduce inclusions) with clear criteria.

F) Lead Flow Bottleneck Finder (pipeline issues)
- Map pipeline stages: Lead → Qualified → Sales Call → Proposal → Close → Onboard.
- Identify the constraint stage using conversion math.
- Output: the single leakiest stage + 3 fixes (messaging, targeting, offer, follow-up, proof, outbound cadence).

G) “Fix This First” Prioritization (biggest impact)
- Use an Impact × Effort × Risk scoring table.
- Provide the top 3 fixes with:
  - exact steps,
  - owner (role),
  - time required,
  - success metric,
  - expected leading indicator in 7–14 days.

Quality Bar
- Keep it practical and numbers-driven.
- Use my inputs to produce real calculations (not placeholders) where possible; if an input is missing, state the assumption clearly and show how to replace it with the real number.
- Avoid generic advice; every recommendation must tie back to a scorecard result or calculation.
- Use plain language. No fluff.

Formatting
- Use clear headings for Modules A–G.
- Include tables for the Scorecard and the Prioritization engine.
- End with a 14-day action plan checklist.

Now generate the full diagnostic framework using the inputs provided above.
Role & Goal
You are an experienced agency growth consultant. Build a single, cohesive “Growth Bottleneck Identifier” diagnostic framework tailored to my agency that pinpoints what’s blocking growth and tells me what to fix first.

Agency Snapshot (use these exact inputs)
- Agency type/niche: [YOUR AGENCY TYPE + NICHE]
- Primary offer(s): [SERVICE PACKAGES]
- Average delivery model: [DONE-FOR-YOU / COACHING / HYBRID]
- Current client count (active accounts): [ACTIVE ACCOUNTS]
- Team size (employees/contractors) + roles: [EMPLOYEES/CONTRACTORS + ROLES]
- Monthly revenue (MRR): [CURRENT MRR]
- Avg revenue per client (if known): [ARPC]
- Gross margin estimate (if known): [MARGIN %]
- Growth goal (90 days + 12 months): [TARGET CLIENTS/REVENUE + TIMEFRAME]
- Main complaint (what’s not working): [WHAT'S NOT WORKING]
- Biggest time drains (where hours go): [WHERE HOURS GO]
- Lead sources today: [REFERRALS / ADS / OUTBOUND / CONTENT / PARTNERS]
- Sales cycle + close rate (if known): [DAYS + %]
- Retention/churn (if known): [AVG MONTHS / %]

Output Requirements
Create ONE diagnostic system with:
1) A short overview: what the framework is and how to use it monthly (≤10 minutes/week).
2) A Scorecard (0–5 scoring) that covers all areas below, with clear scoring anchors for 0, 3, and 5.
3) A Calculation Section with formulas + worked examples using my inputs.
4) A Decision Tree that identifies the primary bottleneck (capacity, delivery/process, pricing, or lead flow).
5) A “Fix This First” prioritization engine that ranks issues by Impact × Effort × Risk, and outputs the top 3 actions for the next 14 days.
6) A simple dashboard summary at the end: Bottleneck → Evidence → First Fix → Expected Result.

Must-Include Diagnostic Modules (in this order)
A) Capacity Constraint Analysis (max client load)
- Determine current delivery capacity and maximum sustainable client load.
- Include a utilization formula based on hours available vs hours required per client.
- Output: current utilization %, max clients at current staffing, and “over/under capacity” flag.

B) Process Inefficiency Detector (wasted time)
- Identify top 5 recurring wastes mapped to: meetings, reporting, revisions, approvals, context switching, QA, comms, onboarding.
- Output: estimated hours/month recoverable + the specific process change(s) to reclaim them.

C) Hiring Need Calculator (when to add people)
- Translate growth goal into role-hours needed.
- Recommend the next hire(s) by role (e.g., account manager, specialist, ops, sales) with triggers:
  - “Hire when X happens” (utilization threshold, backlog threshold, SLA breaches, revenue threshold).
- Output: hiring timeline (Now / 30 days / 90 days) + expected capacity gained.

D) Tool/Automation Gap Identifier (what to automate)
- List the highest ROI automations for my time drains (e.g., intake forms, client comms templates, reporting, task routing, QA checklists).
- Output: automation shortlist with estimated hours saved/month and suggested tool category (not brand-dependent).

E) Pricing Problem Revealer (revenue per client)
- Compute revenue per client, delivery cost proxy, and “effective hourly rate.”
- Diagnose underpricing vs scope creep vs wrong packaging.
- Output: pricing moves (raise, repackage, tier, add performance fees, reduce inclusions) with clear criteria.

F) Lead Flow Bottleneck Finder (pipeline issues)
- Map pipeline stages: Lead → Qualified → Sales Call → Proposal → Close → Onboard.
- Identify the constraint stage using conversion math.
- Output: the single leakiest stage + 3 fixes (messaging, targeting, offer, follow-up, proof, outbound cadence).

G) “Fix This First” Prioritization (biggest impact)
- Use an Impact × Effort × Risk scoring table.
- Provide the top 3 fixes with:
  - exact steps,
  - owner (role),
  - time required,
  - success metric,
  - expected leading indicator in 7–14 days.

Quality Bar
- Keep it practical and numbers-driven.
- Use my inputs to produce real calculations (not placeholders) where possible; if an input is missing, state the assumption clearly and show how to replace it with the real number.
- Avoid generic advice; every recommendation must tie back to a scorecard result or calculation.
- Use plain language. No fluff.

Formatting
- Use clear headings for Modules A–G.
- Include tables for the Scorecard and the Prioritization engine.
- End with a 14-day action plan checklist.

Now generate the full diagnostic framework using the inputs provided above.

使用场景Best used for

适合营销、销售和产品表达,使用前请替换其中的角色、主题和具体约束。

Useful for marketing, sales, and product messaging. Replace the role, topic, and constraints before using it.

使用提醒Usage note

这条内容来自 prompts.chat 公开提示词库;说明为中英对照,正文保留来源原文。使用前请检查并按自己的工作场景改写。

Sourced from the prompts.chat public library. Descriptions are bilingual; the prompt preserves the original text. Review and adapt it to your work before use.